Thu Thiem Tunnel

The Thu Thiem Tunnel is 1,490 m long, crossing the Saigon River and connecting District 1 and District 2. Construction began in 2004, it was inaugurated on November 20, 2011, and opened to traffic on November 21, 2011. The main contractor was Obayashi Corporation – Japan.