Ca Mau Fertilizer and Power Plant

The Ca Mau Fertilizer and Power Complex was fully commissioned in 2009. The project investor is Vietnam Oil and Gas Group. The entire project covers 200 hectares in Khanh An Commune, U Minh District, Ca Mau Province. The complex consists of four main projects:

-   The 325 km gas steel pipeline (298 km submerged offshore) was inaugurated on August 28, 2008.
-   Two thermal power plants with a total capacity of 1,500 MW were completed on December 27, 2008.
-   The fertilizer plant, with a capacity of 800,000 tons per year, was completed in 2009.
-   Industrial cluster utilizing low-pressure gas.

The total investment is approximately USD 2 billion.